<strike id="zfjhh"><i id="zfjhh"></i></strike>

<em id="zfjhh"><strike id="zfjhh"><i id="zfjhh"></i></strike></em>

    <p id="zfjhh"></p>

      <strike id="zfjhh"><dl id="zfjhh"></dl></strike>
        <strike id="zfjhh"></strike>

        Main process:

        Sanitary wares Production Process

        Raw material storage
        • 梦佳卫浴
        Raw material weighing
        • 梦佳卫浴
        Raw material ball-grinding
        • 梦佳卫浴
        • 梦佳卫浴
        Design and mould making
        • 梦佳卫浴
        Mud preparation and storage
        • 梦佳卫浴
        • 梦佳卫浴
        Semi-auto high-pressure casting line
        • 梦佳卫浴
        Semi-auto high-pressure cistern casting line
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        Drying
        • 梦佳卫浴
        Semi-finished products inspection
        • 梦佳卫浴
        • 梦佳卫浴
        Glazing
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        Loading & Firing
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        Final products inspection (including cold processing ) all the qualified products are sent to the warehouse. Partial unqulified products will be refired and then reinspected again . If ok, then sent to the warehouse , If not , will be distroied.
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        • 梦佳卫浴
        COPYRIGHT ? 2018 MONGA ALL RIGHTS RESERVED Design By Weipai
        平安彩票